installlation of 180 tonnes Ubeams

2009-09-25


Descrierea proiectului:

because of the dimension of beams and location our proposal for this project was to use 2 crawler cranes.


the cranes used are Kobelco 2500-2F with 33.5 meters main boom able to lift 90 tonnes at 11 meters radius(safety coeficient 20%) and Liebherr LR 1300/1 with 38 meters main boom able to lift 90 tonnes at 13 meters radius(safety coeficent 23%)


the target from the beneficary was 3 beams by day,but we realised a media of 5 beams by day.


all the crew for rigging and supervising are provide by our company.


 