Lifting 480 tonnes reactor

Limba / language: Limba română English

wind turbines Powerwind

2009-05-25


Descrierea proiectului:

equipement used for installing of 2 turbines


 


Demag cc1800-1 with 72 meters main boom and 12 meters fly jib and Liebherr ltm 1080 like auxiliary crane.


 


because of the heavy acces was used 2 trucks with 6x6 traction for pulling the trailer with the crane up


the distance from road to final location was 9 km

Imagini

wind turbines Powerwind
wind turbines Powerwind
wind turbines Powerwind
wind turbines Powerwind
wind turbines Powerwind
wind turbines Powerwind