Lifting 480 tonnes reactor

Limba / language: Limba română English

installing of 90 to beams

2009-07-22


Descrierea proiectului:

putting in position of 7 beams with the lengh of 40 meters and weight of 90 tonnes each


the job was done with crawler crane Demag cc 1800-1 with 150 tonnes of counterweight on superlift


the  radius for final position of the beam was 32 meters


the crane travell with the beam in the  hook aprox 200 meters


 