Lifting 480 tonnes reactor

Limba / language: Limba română English

unloading/storage of wind turbines GE project

2009-03-01


Descrierea proiectului:

the objects of work are:


in the port area :


      - unloading wind turbines from the ship 


      - arranging of wind turbines into the storage area


cranes used


     - crawler crane Kobleco cke 2500


     - telescopic crane Grove 5130


 


in the temporary storage area


    - crawler crane Demag cc 1800-1


 


project will be for 159 wind turbines


 

Imagini

unloading/storage of wind turbines GE project
unloading/storage of wind turbines GE project
unloading/storage of wind turbines GE project